When Assembling Lean Tubes, You Should Pay Attention To These Seven Points!

Lean pipe (also known as wire rod) is a steel-plastic composite pipe with an outer plastic-coated layer, a middle metal layer and an inner layer of anti-rust layer. The current process is that the plastic layer is directly attached to the metal layer. The inner wall of the steel pipe is anti-corrosion coating, the standard wire rod material diameter is 27.8mm±0.2mm, and the steel pipe wall thickness is 0.7mm, 0.8mm, 1.0mm, 1.2mm and 2.0mm. Wire Bar Products is a modular system of pipe fittings and wire bar connectors that can transform any creative idea into a personalized, realistic structure and is extremely simple and quick to manufacture at low cost. So here are the seven points you should pay attention to when assembling a lean tube:

1. When assembling the lean pipe, the load-bearing rod should be assembled first, and then the connecting rod should be assembled;

2. When assembling the lean tube, the side piece and the bottom piece should be assembled first, and then the connecting rod should be assembled;

3. When assembling the lean pipe, the two ends should be assembled first, and then the middle;

4. When assembling the lean pipe, all the lean pipe joints and the lean pipe should be installed according to the specifications and sizes, so that it can be done in one step;

5. When assembling the lean pipe, make sure that each joint screw is tightened in place during the installation process;

6. Do not use a hard hammer to hit the lean tube and Liansu tube when assembling the lean tube;

7. When assembling the lean tube, make sure that the rest of the column is vertical when assembling the column, so as to avoid uneven stress on the entire wire rod frame and cause damage.