First of all, before we make the workbench, we need to fully consider the overall application environment, and then make the plan according to the specific actual situation. After we determine the plan, the pipe can be cut and assembled by special equipment and make a variety of structural frame parts of different specifications.
Secondly, we can use different types of lean pipe joints to fix each connected local device, and assemble each component that has been made into the main structure frame of the independent workbench according to the scheme drawings.
Third, after we basically completed the prototype of the independent workbench, after the first and second two steps, that is, we often say the production of the main structure. The fourth production of the independent work panel baffle. The baffle is a part of the workbench.
First, the finished aluminum profile shall be installed on the structural frame of the top part of the independent working table. A total of two fixed parts should be installed, and then the green baffle can be installed in the middle, the baffle generally paste a station of the operation instructions or matters needing attention and other content. Fifth, we need to put the lean pipe working table from the ground and use a spray gun or other equipment to spray the whiteboard.
The working table is made of anti-static data. First of all, the whiteboard used to make the table is clean and used to fix the anti-static materials. Sixth, we should make a good table table around a layer of glue, table bread, table bread side work is also a very important step, and then used to wrap the edge of the data around the table bread, finally beat the rubber hammer to ensure that the edge of the table will not fall off. The seventh independent work table of the main structure frame, table are completed, through the above six steps. Put the two parts together so that a lean tube workbench is assembled.