1. Before installing the slide rail, the burrs, dirt and scratches on the mechanical installation surface must be removed.
2. Using side fixing screws or other fixing devices, gently place the guide rail on the base, so that the guide rail and the side mounting surface are slightly matched.
3. Slightly tighten the positioning screws of the slide rail from the center to the side, so that the slide rail is slightly matched with the vertical mounting surface. The order from the center to the end is compact to ensure more stable accuracy. After slightly tightening the vertical base surface, the locking force of the side base surface will be strengthened, and the main guide rail can be reliably installed on the side base surface.
4. Use a torque wrench to lock the torque according to various materials, and slowly tighten the positioning screws of the slide rail.
5. Install the sub-rails in the same way, and install the slides on the main and sub-rails respectively